The repairs, estimated to total £22.6m, including repairs to the concrete deck, removing blockages from the drainage system, waterproofing and on replacing or refurbishing corroded bearings.
SHE’S THAT SHE DIDN’T. SHE DID THIS. THE WORK INVOLVES MORE THAN REMOVING THE CONCRETE OUT OF THE STORM DRAIN. IT’S RESTORING THE SYSTEM TO THE WAY IT WAS BEFORE. AT LEAST IT’S BEING DONE.